DistributorIndex logoDistributorIndex

How Axis project pricing works: prepare the distributor handoff

Updated

Prepare an Axis project pricing request, map integrator and distributor responsibilities, hand over the BOM, and track quote revisions without assuming approval.

A white security camera and its mounting foot rest on a scratched grey workbench beside a network cable
Match each camera and mounting accessory in the bill of materials to the project design before requesting pricing.

Axis project pricing follows partner project registration, individual Axis review, a quote to distribution partners and review of subsequent revisions. Match the distributor’s written quote to the accepted BOM and project revision before placing the order.

This guide is for security integrators preparing a distributor handoff after initial system design. If you still need a supplier shortlist, start with security camera distributor research. Use the responsibility table, input checklist and revision log to connect the current BOM to the distributor’s quotation.

DistributorIndex is a manufacturer; this guide is part of our brand and channel resource library. The Axis Communications distributor hub links company records and their sources. Confirm Channel Partner Program membership and pricing-tool permissions through Axis Partner Web.

Establish partner access before preparing the request

Axis describes its Channel Partner Program as intended for businesses delivering complete end-customer solutions through design, integration, installation and support. Its public program page says applicants receive more specific requirements during application. A directory listing is not an application or an eligibility decision.

The public project-registration guide says project pricing is a benefit available at all partner levels and that partners apply in the Axis Project Pricing Tool on Partner Web. Confirm your own access and the current process for your country with Axis or your distributor. Check the permissions shown for your company’s Partner Web account.

Scroll horizontally to see all table columns on smaller screens.

Keep these four decisions separate
DecisionWhat establishes itDo not assume
Company participationAxis confirmation of Channel Partner Program membershipA company appearing in this directory qualifies
User accessThe permissions available to your own Partner Web accountA My Axis login alone grants every tool
Project pricing requestSubmission and the project’s recorded review statusRegistration is automatic approval
Order termsThe distributor’s current written quotationA project reference alone establishes price, validity or stock

Project pricing versus a standard distributor quote

Axis’s project-registration guide describes project pricing for strategic projects. It identifies competition, system design and integration work as relevant project information. Each opportunity is evaluated individually by Axis’s pricing team, sales and management, with a quote provided to distribution partners. Axis evaluates the pricing and timing for each project individually.

For comparison with an ordinary distributor quote, our recommendation is to keep the equipment scope identical and record which quotation is tied to the project reference. Ask the distributor to state the applicable quantities, currency, validity, delivery terms and exclusions in writing. Use those commercial terms to compare quotations for the same project scope.

For a multi-vendor IT and security project, use the deal-registration channel partner and distributor guide to keep eligibility, opportunity approval, quote validity and scope changes in separate records before releasing the order.

Keep NFR separate. Axis’s Partner Web guide describes NFR as demonstration equipment; it is a different tool and purpose from project pricing. Do not apply an NFR discount or demo eligibility condition to an end-customer project quotation.

Who owns each handoff?

The table maps the public process to three participants. The review and revision roles come from Axis’s project-registration guide; the document-control actions are our procurement recommendations. Use the responsibility sheet together with the instructions for your region.

Scroll horizontally to see all table columns on smaller screens.

Integrator → Axis review → distributor quote → revision review
StageIntegratorAxis pricing, sales and managementDistributor
PrepareDescribe the project, design and integration work; identify the current BOMClarify eligibility or access through the appropriate regional contactConfirm the submission route and accepted files
Register and reviewSubmit through the available route; retain the project reference and statusReview each opportunity individually; provide the quote to distribution partnersReceive the Axis quote and clarify the buyer-facing quotation
Check the quotationCompare the returned scope with the submitted BOMResolve project-pricing questions through the review processConfirm the written price and commercial terms for this purchase
ReviseExplain changed scope and follow revisions in the tool where access permitsReview revision requests sent to the dedicated pricing teamThe public guide says distributors can revise projects directly in the tool
Release an order — recommended controlMatch the order to the accepted BOM and quote revisionRecorded project-pricing decisionConfirm which quoted revision the order uses

A request, an Axis project status and a distributor quotation are different records. Our recommendation is to retain all three and resolve any mismatch before placing an order. Use how to verify a distributor listing to check the company separately from the project decision.

Hand over the BOM through the route you can access

The AXIS Site Designer manual documents two submission routes. Open the project, go to Reports and the Bill of materials tab, then select Request project pricing. With the required Partner Web access, choose Open Axis Project Pricing Tool and complete the project details; the manual says the BOM is included automatically.

For a request through a distributor, the same manual says to choose Download the BOM file and attach it when submitting the request to the distributor. Its BOM documentation describes JSON export as well as Excel and print options. Confirm which file your distributor accepts; do not substitute a spreadsheet or PDF for the tool’s BOM file without agreement.

Button availability depends on account permissions. If the documented option is missing, ask Axis or the distributor to confirm your access and the submission route before sending the BOM.

A technician holds a blue Ethernet connector beside the network port of a metal camera housing on a worn workbench
Include the camera’s connection and integration requirements in the design package sent with the BOM.

Prepare one traceable project packet

Competition, system design and integration work are the project background categories named in Axis’s public guide. The other rows below are our suggested handoff controls. Complete the checklist from your current project files and the distributor’s written quotation.

Scroll horizontally to see all table columns on smaller screens.

Project packet checklist — public background categories and recommended controls
ItemWhy it belongs in the handoffRecord or example format
Competition context — publicly named categoryExplains the opportunity Axis is being asked to reviewProject competition summary
System design — publicly named categoryConnects the requested equipment to the proposed solutionCurrent design summary and BOM
Integration work — publicly named categoryDescribes the integrator’s work on the opportunityScope summary
BOM revision — recommendedDistinguishes the current equipment set from earlier filesProject-name_BOM_Rev-A; exact quantities and product references from your design
Project reference and distributor — recommendedConnects the packet to the correct request and trading companyReference assigned to the project
Country, delivery destination and required schedule — recommendedGives the distributor context for its commercial replyYour actual project location and requested dates
Quotation terms to confirm — recommendedPrevents assumptions about price, currency, validity and availabilityRecord only the distributor’s written terms
Change summary — recommendedMakes the difference from the prior packet explicitAdded, removed or changed lines and the reason

Keep confidential end-customer details and commercial information in the verified recipient’s private channel. The brand and country page guide explains how to narrow directory research by market; it cannot establish the correct pricing route or account permissions.

Track revisions before releasing the purchase order

The public project-registration guide says distributors can revise projects in the Project Pricing Tool, integrators can follow those revisions, and revision requests are automatically sent to a dedicated pricing team for review. A changed BOM therefore needs a documented revision path; do not assume a previously quoted price applies to the changed scope.

Copy the revision log and add one row per change, using the BOM files, project status and written replies to keep the order aligned with the accepted scope.

Scroll horizontally to see all table columns on smaller screens.

Project revision log — copy and complete for your order
Record fieldYour entryWhat closes the entry
Project reference / distributorBoth parties identify the same opportunity
Previous BOM filename and revisionPrevious scope is retrievable
New BOM filename and revisionChanged scope is retrievable
Changed lines, quantities and reasonDistributor understands what changed
Date sent and responsible recipientThe correct recipient acknowledges receipt
Pricing review status and evidenceActual tool record or written reply
Returned quote reference, revision and validityWritten quote matches the revised scope
Order reference and accepted BOM / quote revisionOrder and accepted documents agree
Gloved fingertips steady a white camera mounting plate and threaded bracket on a scratched metal bench
Changes to mounting accessories belong in the revised BOM so the distributor prices the complete installation scope.

If the quote, quantities or revision references disagree, hold the order while the distributor resolves the discrepancy. The evidence labels in how we verify listings and what a listing means describe company research records; they do not validate quotation terms.

Your distributor handoff

Send your requirements in the completed packet to your chosen Axis distributor: competition context, system design, integration scope, current BOM and revision, project reference if assigned, country, delivery destination, requested schedule and change summary. Ask the distributor to confirm the accepted file format, who submits or revises the request, and which written quote and revision apply. Submit the packet through the distributor’s agreed private channel.

Sources and applicable market

Axis source documents: Channel Partner Program, Project registration step by step guide, pages 1–2; Your guide to Axis Partner Web, pages 4–5; and the AXIS Site Designer manual, Bill of materials and Request project pricing sections.

The project-registration and Partner Web guides carry a 2023 copyright; the Site Designer manual describes the BOM submission routes. Confirm current regional policies and account permissions with Axis or the distributor. Project discounts, approval, quote validity and stock are determined through Axis and the applicable distributor’s current program. The responsibility sheet, packet checklist and revision log are editorial tools.

Related pages